QBF sidewall belting installed for China water conservancy project
- Categories:NEWS
- Author:
- Origin:
- Time of issue:2022-04-25 18:02
- Views:
(Summary description)Specification are as below,
B1400 ST2500 8+8 224 Meters
S400-205 TCS-360
QBF sidewall belting installed for China water conservancy project
(Summary description)Specification are as below,
B1400 ST2500 8+8 224 Meters
S400-205 TCS-360
- Categories:NEWS
- Author:
- Origin:
- Time of issue:2022-04-25 18:02
- Views:
Information
Sticky material is a big chanllenge for sidewall belting especially for muck unloading process.
QBF developed special rubber compound coated on the surface of base belt and cleat with the water spray support from the conveyor system.
After testing it meets with user's satisfactory and QBF got 8 orders for this project.
Keyword:
Scan the QR code to read on your phone