Sidewall Belting installed Successfully in Russia

  • Categories:NEWS
  • Author:
  • Origin:
  • Time of issue:2018-12-27 17:02
  • Views:

(Summary description)
Material: Clay/Loam from tunnel

Capacity: 1,000.00 TPH

Density: 1.15 T/M3

Belt Speed: 3.00 M/Sec

Sidewall Belting installed Successfully in Russia

(Summary description)
Material: Clay/Loam from tunnel

Capacity: 1,000.00 TPH

Density: 1.15 T/M3

Belt Speed: 3.00 M/Sec

  • Categories:NEWS
  • Author:
  • Origin:
  • Time of issue:2018-12-27 17:02
  • Views:
Information

Material: Clay/Loam from tunnel

Capacity: 1,000.00 TPH

Density: 1.15 T/M3

Belt Speed: 3.00 M/Sec

Scan the QR code to read on your phone